Project: N524JL/N87JL   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeremy Leonard   -  
Project:   Vans - RV-7A   -   VIEW REPORTS
Total Hours:1074
Total Flight Time:
Start/Last Date:Mar 17, 2021 - No Finish Date
Engine:Lycoming IO360M1B
Propeller:Sensenich 3 Blade Composite Ground Adjustable/Fixed pitch
Panel:Garmin G3XTOUCH/GNX375/G5/GTR200/GFC507
 
Friendly URL: https://eaabuilderslog.org?s=N524JL/N87JL

Home or Last Project Picture

Aug 16, 2022     Leading edge cradle and leading edge - (20 hours)       Category: Wings
I built a leading edge cradle to hold both the leading edge and fuel tanks during the construction phase. Leading was clekoed together and placed on the spar. Oooooooo, really starting to become an airplane, and damn is this thing becoming SOLID.
The joint plate strip that goes between the leading edge and the tank came attached to the tank skin, PRE-PUNCHED…. Thank you Vans!!! Everything fit together perfectly and it was nice to see that I indeed straightened the ribs correctly. All holes final size reamed here as well.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.